PWRE teams up with HDR, Inc. to win Truckee River Hydropower Feasibiliy Project

PWRE is pleased to be subcontracting with HDR, Inc. in Reno, NV to conduct the Pyramid Lake Paiute Tribe's hydropower feasibility project.  HDR brings extensive experience with hydropower feasibility analysis, and PWRE brings our knowledge of the Truckee River system and modeling tools to make an ideal team to perform this study.  The study will be conducted through the summer and fall of 2015 resulting in recommendations and a detailed report in early 2016.